Terms and Conditions
- 1
Backfilling of a trench is made by the excavated soil. The soil is flattened.
- 2
Restoration of greenery (lawn) is possible on the basis of an additional contract for an additional fee. The owner/proprietor of the real estate must inform the existing communications (electrical and communication lines in the ground) prior to the start of excavation works.
- 3
If additional works are required (in particular, possible reinforced concrete or metal structures in the ground about which the customer does not know), their execution and payment are agreed in a separate additional contract.
- 4
This price offer does not include the cost of insulation material to cover the existing pipeline in the immediate vicinity of the house.
- 5
The customer must conduct an ongoing review of the work and compliance with quality requirements at any time, with the involvement of experts, if necessary.
- 6
The customer must check the progress of the work and give instructions to the contractor regarding the continuation of the work.
- 7
The work executed is covered by a two-year warranty for normal daily use.
- 8
The company is not responsible for the installation of materials purchased by the customer.
- 9
The customer under the contract for work and materials must pay on the basis of the invoice issued to the current account of the company.
- 10
Minor and emergency works are carried out by FastPlumber OÜ.